ADU build-cost estimator
Pick the ADU type, size, finish level, and state. Ranges include labor multipliers; site work, permits, and contingency are added in the all-in total below.
Estimates only. Excludes land, financing interest, and site-specific work (see the Site Work tab). Verify zoning & permits locally.
Prefab vs stick-built comparator
Factory-built ADUs trade design freedom for speed and often lower cost. Compare apples-to-apples at your size and state.
Note: prefab totals exclude site work (foundation, utilities) which both methods need — price those in the Site Work tab. Factory lead times vary.
Prefab trade-offs at a glance
| Factor | Prefab | Stick-built |
|---|---|---|
| Cost predictability | Fixed factory price; fewer change orders | Bid-based; change orders common |
| On-site build speed | Days to set modules once delivered | 6–12 months of on-site construction |
| Design flexibility | Limited to factory catalog options | Fully custom floor plans |
| Site disruption | Weeks of heavy work, not months | Months of noise, trades & inspections |
| Crane & access needs | Requires crane access to the lot | No crane needed |
| Appraisal & resale | Appraises like site-built once complete | Longest track record with appraisers |
ADU permit fees by state
Plan-check + building permit + typical ADU impact fees. Your city or county sets the final schedule — several states cap impact fees on small ADUs.
Check locally. Fees are set by city/county, not the state — these are statewide planning bands (2024–2026). Some cities waive or cap ADU impact fees.
All 50 states + DC
| State | Low | High | Labor index |
|---|
Rental income ROI & payback
The decision tool: enter total project cost and expected rent to see payback years, cap rate, and 10-year net operating income — with or without financing.
Planning math, not investment advice. Simple payback uses gross rent; real returns depend on actual vacancy, maintenance surprises, and rent growth. Talk to a local CPA about depreciation and tax treatment.
ADU vs home addition
Same dollars, different payoff: an addition adds space; an ADU adds space plus rental income. Compare cost, appraised value-add, and net position.
Model: additions recoup ~62% of cost (Cost-vs-Value style); ADUs valued at 10× gross annual rent, capped at 130% of cost. Appraisals vary by market — this is a planning comparison, not an appraisal.
ADU financing estimator
Compare monthly payments across the three most common ways homeowners fund an ADU. Rates are editable — 2024–2026 typical starting points shown.
Not financial advice. HELOC rates are variable and usually interest-only during the draw period; construction loans often convert to a permanent mortgage. Confirm terms with your lender.
All three products, same amount
| Product | Typical rate | Monthly | Total interest | How it works |
|---|
Site-work cost adders
The hidden half of ADU budgets. Tick everything your project needs — detached new builds need most of these; conversions need few.
Estimates only. Utility trenching distance, soil, and slope swing these numbers the most. Get site-specific bids early — before finalizing the ADU design.
ADU cost questions, answered
Straight answers on ADU prices, permits, prefab, rental payback, and financing.