Transformer Sizing Calculator

Full-load amps (1-phase & 3-phase, both directions), kVA sizing from load with NEC-style 25% margin, standard kVA sizes, turns ratio, impedance %Z short-circuit current, and inrush estimates — in one page.

100% client-side — no data leaves your device

Full-load current from kVA

Single-phase: I = kVA × 1000 ÷ V. Three-phase: I = kVA × 1000 ÷ (√3 × V).

kVA
V
Full-load current
—
—
Current at 50% load
—
kW at PF 0.8
—
Min. standard size

kVA from measured amps

Single-phase: kVA = I × V ÷ 1000. Three-phase: kVA = √3 × I × V ÷ 1000.

A
V
Apparent power
—
—
Next standard size up
—
Utilization of that size
—
kW at PF 0.8

Size a transformer from load

Required kVA = (kW ÷ PF) × (1 + margin) ÷ demand factor, then round UP to the next standard size.

kW
%
V
Required transformer
—
—
Calculated kVA (before rounding)
—
FLA at chosen voltage
—
Utilization

60 kW at PF 0.8, DF 1.0, 25% margin → (60 ÷ 0.8) × 1.25 = 93.75 kVA → next standard size 112.5 kVA, never 75 kVA.

Turns ratio

Vp ÷ Vs = Np ÷ Ns = Is ÷ Ip. Voltage steps down, current steps up proportionally.

V
V
A
Turns ratio Np:Ns
—
—
Secondary current
—
Secondary power
—
Power check

Impedance voltage (%Z)

Short-circuit current Isc = FLA ÷ (%Z ÷ 100). Typical %Z: 2–3.5% for small dry-type, up to 5.75% at 500 kVA.

A
Available short-circuit current
—
—
Voltage drop at load
—
× FLA (fault multiple)
—
Fault current (kA)
Inrush note: magnetizing inrush on energization reaches roughly 8–12× FLA for ~0.1 s as the core saturates — a 75 kVA / 480 V unit (90.21 A FLA) can briefly pull 720–1,080 A. Use time-delay primary protection with an inrush-tolerant trip curve, not an instantaneous-only breaker sized at FLA.

Standard kVA sizes — full-load current table

Reference table generated by the same engine above. 3-phase uses line-to-line voltage; 1-phase uses the winding voltage.

Full-load amps by standard kVA size
kVA3-ph 208 V3-ph 480 V3-ph 600 V 1-ph 120 V1-ph 240 V1-ph 480 V

The formulas, all in one place

I (1-phase) = kVA × 1000 ÷ V
I (3-phase) = kVA × 1000 ÷ (√3 × V)
kVA (1-phase) = I × V ÷ 1000   |   kVA (3-phase) = √3 × I × V ÷ 1000
Required kVA = (kW ÷ PF) × (1 + margin) ÷ demand factor → round UP to standard size
Vp ÷ Vs = Np ÷ Ns = Is ÷ Ip   →   Ip = Is × Vs ÷ Vp
Isc = FLA ÷ (%Z ÷ 100)   |   Voltage drop ≈ %Z × load fraction

Worked example: 75 kVA, 3-phase, 480 V → 75,000 ÷ (1.7320508 × 480) = 90.21 A full-load current per phase.

Scope boundary — what this tool does and does not do

  • Does: transformer kVA sizing, full-load amps both directions, standard-size selection, turns ratio, impedance short-circuit current, voltage-drop and inrush estimates.
  • Does not: conductor/ampacity sizing, breaker selection, motor-starting studies, harmonic/K-factor analysis, or grounding design.
  • Estimates follow standard formulas only — final selection must comply with your local electrical code and be verified by a licensed electrician or engineer.
  • Need plain electrical power conversion without transformers? See our amps to kW calculator.

Frequently asked questions

What is transformer sizing?

Transformer sizing means choosing a transformer whose kVA rating covers your load with the right safety margin. The core math is apparent power: kVA = (kW ÷ power factor) × (1 + margin) ÷ demand factor. This calculator does that math, snaps the result up to the nearest standard size (15 to 500 kVA), and also computes full-load amps, turns ratio, impedance voltage effects, and inrush estimates.

How do I calculate full-load amps for a 3-phase transformer?

Use I = S ÷ (√3 × V), where S is the kVA rating in VA and V is the line-to-line voltage. Example: a 75 kVA, 3-phase, 480 V transformer gives 75,000 ÷ (1.732 × 480) = 90.21 A per phase. Forgetting the √3 factor is the most common 3-phase mistake — it makes the answer 73% too high.

How do I calculate full-load amps for a single-phase transformer?

Use I = S ÷ V. Example: a 25 kVA single-phase 240 V transformer draws 25,000 ÷ 240 = 104.17 A. At 120 V the same 25 kVA would draw 208.33 A — halving the voltage doubles the current, which is why low-voltage runs need heavier conductors and bigger breakers.

Can I convert amps back to kVA?

Yes — the formulas work in both directions. Single-phase: kVA = amps × volts ÷ 1000. Three-phase: kVA = √3 × amps × volts ÷ 1000. Use the “Amps → kVA” mode in the calculator above; it automatically picks the right formula for 1-phase or 3-phase.

What are the standard transformer kVA sizes?

The common dry-type standard sizes are 15, 30, 45, 75, 112.5, 150, 225, 300, and 500 kVA. After computing the required kVA from your load, always round UP to the next standard size — a 93.75 kVA requirement becomes a 112.5 kVA transformer, never a 75 kVA one.

How do I size a transformer from my load in kW?

First convert real power to apparent power: kVA = kW ÷ power factor (use 0.8 for mixed motor loads, 1.0 for pure resistive heating). Then apply a 25% margin per common NEC practice for continuous loads and divide by your demand factor. Example: 60 kW at PF 0.8 with demand factor 1.0 → (60 ÷ 0.8) × 1.25 = 93.75 kVA → next standard size 112.5 kVA.

What demand factor should I use when sizing a transformer?

Demand factor is the fraction of connected load expected to run at once. Use 1.0 if everything can run simultaneously, 0.8 for typical commercial panels, and lower (0.5–0.7) for diversified loads like lighting plus receptacles. A realistic demand factor avoids buying a transformer twice as big as you need.

What does transformer impedance (%Z) mean?

Impedance voltage (%Z) is the percentage of rated voltage needed to drive full-load current through a shorted secondary — typically 2–6% for distribution transformers. It sets the available short-circuit current: Isc = FLA ÷ (%Z ÷ 100). Example: 75 kVA 480 V 3-phase has 90.21 A FLA; with %Z = 3.5, the bolted-fault current is about 2,578 A. Use this for breaker interrupting-rating checks.

What is transformer inrush current and why does it matter?

When a transformer is first energized, magnetizing inrush can reach 8–12 times full-load current for roughly 0.1 seconds as the core saturates. A 75 kVA 480 V unit (90.21 A FLA) can briefly pull 720–1,080 A. This is why transformer primary protection uses time-delay fuses or breakers with inrush-tolerant trip curves — an instantaneous-only breaker sized at FLA would nuisance-trip on every energization.

What is the turns ratio of a transformer?

Turns ratio links voltages, turns, and currents: Vp ÷ Vs = Np ÷ Ns = Is ÷ Ip. A 480 V to 120 V transformer has a 4:1 ratio. Current transforms inversely: if the secondary carries 100 A at 120 V, the primary carries 100 × 120 ÷ 480 = 25 A at 480 V. Power in equals power out (minus small losses).

How do I estimate voltage drop through a transformer?

Approximate load voltage drop as %Z × load fraction. A transformer with 3.5% impedance running at 50% load drops about 1.75% of rated voltage (8.4 V on a 480 V system). At full load the drop is the full %Z. Keep total system drop within your code limit — typically 5% from service to the farthest outlet.

How does voltage choice change the full-load current?

Current is inversely proportional to voltage for the same kVA. A 112.5 kVA 3-phase transformer draws 312.5 A at 208 V but only 135.3 A at 480 V. Higher distribution voltage means smaller conductors, smaller conduits, and lower I²R losses — the reason industrial plants distribute at 480 V and step down near the load.

Is it OK to oversize a transformer?

Moderate oversizing (one standard size up) is normal and harmless, but gross oversizing wastes money and energy: core (no-load) losses run 24/7 whether loaded or not, and efficiency peaks around 50–80% loading. Size for the real load plus margin, not for the biggest unit you can afford.

Do I need a licensed electrician to size a transformer?

This calculator gives engineering estimates from standard formulas, but real installations must follow your local electrical code (NEC Article 450 in the US, or PUIL in Indonesia), utility rules, and short-circuit studies. Have a licensed electrician or engineer verify the final selection, overcurrent protection, and grounding before you buy or install anything.